国产成人综合色在线观看网站-蜜臀视频在线一区二区三区-亚洲精品无码国产-国产亚洲日韩欧美另类第八页-欧美熟妇精品一区二区三区

Information

The surface process of the waste water for the wastewater

1. Polishing the wastewater. During the process of the polishing on the parts, there will be abrasive materials and brightener existing in the waste water. The main pollutants are COD,BOD and SS. Refer to the following process procedures for treatment:
Wastewater → regulating tank→ coagu-flocculation reaction tank→ sediment tank→ hydrolysis acidification pool→ aerobiotic tank →secondary sedimentation tank→ filter →discharge

2. Remove oil and grease from the wastewater: The normal grease removal processes are: organic solvent degreasing, chemical degreasing, electrochemical degreasing, and ultrasonic wave degreasing. In addition to the organic solvent degreasing, other processes will contain degreasant such as alkaline matter, surface active agent and corrosion inhibitor, which will produce pollutants including pH, SS, COD, BOD, petroleum and chromaticity. Refer to the following steps to process:
Wastewater→ oil separator tank→ regulating tank →air-floatation equipment →anaerobic hydrolysis acidification →aerobicbiotreatment → sediment →filtration and adsorption →Discharge  
This type of the wastewater normally contains emulsified oil. Add demulsifier of CaCl2 before air floatation to break the emulsified oil. If the COD concentration in the waste water is too high, anaerobic method can be selected. If it is not too high, choose aerobic biotreatment for the process.
 
3. Pickling waste water. Pickling waste water is often used in the acid pickling process for the steel parts. The PH value of the waste water is 2-3, with high concentration of Fe2+ and SS. Refer to the following procedures for the treatment: wastewater→regulating tank→neutralizing tank→aeration oxidation pool→coagu-flocculation reaction tank→sediment tank→filter tank→pH value readjust tank→discharge  The phosphating wastewater can also called membranadermalis wastewater, which means that iron parts will produce a layer of phosphateprotective film on its surface as the painting coatings after being chemical processed in the solutions of manganese, iron and zinc to prevent rust. The major pollutants in this kind of wastewater is : pH,SS,PO43-,COD, and Zn2+. Refer to the following steps for the process: wastewater→regulating tank→primary coagu-flocculation reaction tank→sediment tank→ secondary coagu-flocculation reaction tank→secondary sedimentation tank→filter tank→discharge
 
4. The anodic oxidation wastewater for the aluminum. The main pollutants for this kind of the wastewater is pH,COD,PO43- and SS. Apply the phosphating wastewater process tfor the anodic oxidation wastewater.

主站蜘蛛池模板: 国产亚洲精品第一综合另类| 丰满少妇av无码区| 国产av熟女一区二区三区| 国产av人人夜夜澡人人爽| 精品一区二区三区影院在线午夜| 日本无遮挡边做边爱边摸| 狠狠久久噜噜熟女| 亚洲色成人www永久网站| 久久99精品福利久久久久久| 亚洲国产精品无码久久久久高潮| 中文字幕人妻无码视频| 亚洲另类自拍丝袜第五页| 久久99精品国产99久久6男男| 国产精品99久久久久久猫咪| 97无码免费人妻超级碰碰夜夜| 伊人久久综合精品无码av专区| 国产精品久久久久秋霞鲁丝| 图片小说视频一区二区| 国产又爽又黄又刺激的视频| 337p日本欧洲亚洲大胆在线| 亚洲欧美中文日韩v日本| 亚洲精品国产品国语在线观看| 亚洲最大中文字幕无码网站| 亚洲制服丝袜av一区二区三区| 小泽玛利亚一区二区免费 | 国产激情一区二区三区| 中文字幕网伦射乱中文| 中文字幕 制服 亚洲 另类| 高h纯肉无码视频在线观看| 19禁无遮挡啪啪无码网站性色| 久久婷婷人人澡人人爽人人爱| 丰满少妇高潮惨叫久久久一 | 国产69精品久久久久99尤物| 成年女人黄小视频| 天天爽天天爽天天片a| 亚洲粉嫩高潮的18p| 精品国产天堂综合一区在线| 精品无码国产不卡在线观看 | 欧美黑人异族videos| 亚洲欧美在线制服丝袜国产| 好硬好湿好爽再深一点动态图视频|